Not a huge amount of progress this weekend because the main priority was replacing the cover on the polytunnel. I did at least manage to get the rest of the door liner completed and dropped the height of the internal window. I also finished off the cladding under the door, which I think means there’s only a small piece above the door, the northern gable and the top piece on the sides of the roof (which I can’t do until the roof is fixed down) left.
I’m quite tempted to order the ply to line the walls now. I know there are other things that need doing first, but getting the lining done would be a big step forward. I’ll have a think about that.