Building an observatory. Construction #30

Today may be something of an event. I actually achieved what I set out to achieve on the observatory today 🙂

To be fair, it wasn’t an awful lot. Just before the Sun set I remembered that I needed to test the end flap for fit so I rushed out to do that. One small adjustment and I was able to finish off the construction in the workshop and cover the outside with membrane. That’s basically it.

Tomorrow I shall try to fit it in place temporarily so the south-west end of the observatory is rain-proof, and then measure up for the north-east gable, hopefully getting that cut as well.

This entry was posted in Astronomy, Observatory, Projects. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *