A few weeks back I picked up a new (to me) lathe: a Boxford ME10 (which is not even remotely new; more likely an antique) converted to single-phase. Fitting it into the workshop in its final place is going to require quite a bit of shifting things around, so today I started on that; moving the bandsaw that I’m going to need to find a new space for and dragging the chopsaw out of the way to leave more space to manoeuvre. I also swept up two large sacks of sawdust from under each of the saws 😀
I’m hoping that tomorrow I can at least get the cabinet into place and the lathe mounted on top of it. Then I’ll start re-arranging everything else.